Preliminary Hydraulic fracturing design

  • Drafting an effective design: selection of hydraulic fracturing fluids, types of proppant, optimization of port placement
  • Work with all types of collectors, including HTR

Retrospective analysis

  • Analysis of the results of the work carried out and identifying the causes of inefficient wells after hydraulic fracturing
  • Compilation of a further program to optimize hydraulic fracturing

Strategy Development

  • Development of an effective production stimulation program
  • Define and minimize risks for the first hydraulic fracturing on the field

Support of works

  • Identify potential complications, make recommendations for injection tests and main fracturing job
  • 24/7 support